14. Newtown
May  24 (walked nearby)
Anonymous developer want to put 3 turbines close to South Molton
15. Batsworthy Cross
May 26 (stayed in area May 24/25/26)
Npower: 9 turbines 100m (328ft) high, pylons, close to Exmoor with views of Dartmoor
16. Fanny`s Cross
 May 26 (walked through )
Airtricity have earmarked this site close to above
17. Knowstone
(visited in several times, extra walk in 2007)
Airtricity again are talking to people around Knowstone, even closer to Exmoor, on Two Moors Way near South Molton, 3 turbines or many more?
27. News just in (Jan 2007): Cross Moor and Bullaford Moor (visited this area  January 2006)
One turbine in Knowstone parish, one in Bishops Nympton parish.  Planning application for 2 x 100m turbines
28. News just in : May 3rd Dulas have prepared their scoping document for 10 or 11 turbines on Luckett, Bullaford and Owlaborough Moors.  A scoping document is a precursor to a planning application.This site lies south of the B3227 and north of Knowstone Village.

This information below came from The Two Moors Site (where you can also see a couple of maps)


Npower is planning to put 9 x 103m wind turbines at  Batsworthy Cross, next to Rose Ash, Rackenford, Creacombe and Knowstone and half way between Tiverton and South Molton. These turbines will be visible from Dartmoor to Exmoor. 

Airtricity has approached landowners about a massive wind turbine site just north of Knowstone around Luckett Moor, Pauls Moor, Bullaford Moor and Wester Bullaford Moor. 

Coronation Power are proposing to put 4 x 125m wind turbines at Bickham Moor near Oakford and East Knowstone.

Link to maps on this site

http://www.twomoorscampaign.co.uk/pictures.html

Also from this site, these details:

but please go to the Main Two Moors site for more news and information.


PLANNING APPLICATION 43272 AT BATSWORTHY CROSS IN NORTH DEVON FOR INSTALLATION & OPERATION OF 9 WIND TURBINE GENERATORS OF MAXIMUM 103M TO TIP HEIGHT, UNIT TRANSFORMER ENCLOSURES, SUBSTATION BUILDING, ANEMOMETER, ACCESS TRACKS & ANCILLARY EQUIPMENT

BICKHAM MOOR WIND TURBINE SITE

 A site notice went up yesterday for a 60m anemometer mast at Bickham Moor (between Knowstone and Oakford). The application is for the erection of the mast for 18 months.